Boulder Creek Wind Farm

Boulder Creek Wind Farm
/
/
Boulder Creek Wind Farm

Boulder Creek Wind Farm

Xiaogang–Linyuan Line Civil Works and Electromechanical Facilities Project

Backed by deep engineering expertise, we deliver critical infrastructure, from metros, roads and bridges to advanced water treatment, connecting communities and supporting a more resilient future. 

Harnessing Wind for Queensland’s Future: The Boulder Creek Wind Farm

To accelerate Australia’s journey towards a net-zero future, DT Infrastructure is delivering a landmark design and construction contract for Aula Energy to build the Boulder Creek Wind Farm.

Delivering a renewable energy project of this immense scale across challenging terrain is a significant engineering and logistical feat. As the very first wind farm project to be delivered by the Gamuda Group under DT Infrastructure, we are uniquely leveraging our robust international clean energy expertise whilst executing the vision with pinpoint local precision.

Engineering a Sustainable Grid

To navigate the complexities of this regional deployment, our comprehensive civil and electrical scope moves beyond standard installations. Having collaborated closely with Aula Energy during the Early Contractor Involvement (ECI) phase, we gained invaluable insights into both the project's technical demands and the community's needs, ensuring a successful, community-focused delivery that commenced in late 2024.

Our dedicated scope of works includes:

  • Massive Generation Capacity: Erecting 38 state-of-the-art wind turbines, boasting a combined generating capacity of 228 MW (6 MW per turbine).
  • Complex Civil Works: Constructing 41 km of robust access tracks, expertly navigating challenging, steep elevations with grades of up to 15 percent.
  • Bulk Earthworks: Executing a massive 70,000 m³ of cut and fill bulk earthworks to prepare the site for resilient, long-term operation.
Driving Queensland’s Green Ambitions

This approach allows us to weave sustainable infrastructure into the regional landscape, driving positive economic outcomes for the local community whilst firmly supporting the state’s energy transition.

The impact of the Boulder Creek Wind Farm, equally owned by Aula Energy and CS Energy, will be transformative:

  • Generating enough clean, renewable energy to reliably power approximately 85,000 homes.
  • Significantly contributing to Queensland’s ambitious goal of achieving 50 percent renewable energy generation by 2030.
  • Increasing the region's overall supply of renewable energy, representing a vital step forward in Australia's carbon reduction targets.

Project Details

Location
Queensland, Australia
Year
September 2024

Project Sum

approximately RM702 million (AUD243 million)