Gamuda Taiwan

Shaping a Resilient Future for Taiwan

Building Taiwan’s railway, marine and transmission infrastructure since 2002.

Across the natural landscapes and bustling urban centres of Taiwan, Gamuda is committed to delivering sustainable, innovative infrastructure solutions that fundamentally enhance the lives of local communities. As a key, long-term player in the region's development, we bring robust global expertise and a highly collaborative approach to every single project we undertake.

Our foundational journey in Taiwan began even before the delivery of our world-renowned SMART Tunnel in Malaysia. Between 2002 and 2008, we successfully delivered the pioneering Kaohsiung Mass Rapid Transit (MRT) Orange Line, a critical infrastructure milestone widely recognised for its engineering excellence and lasting positive impact on the city.

A Legacy of Transit Innovation

Since that initial breakthrough, we have continued to shape Taiwan’s transportation landscape, building a strong track record in delivering critical, high-capacity urban mobility projects. Our experience in rail has also laid the foundation for a broader infrastructure portfolio, extending beyond transportation into marine, coastal and energy infrastructure.

In marine infrastructure, we have demonstrated our ability to deliver complex structures in challenging and unpredictable environments, while our ongoing work in coastal infrastructure further strengthens our capabilities in developing critical port and LNG assets. These projects require a high level of engineering precision, resilience and coordination to ensure long-term connectivity and operational reliability.

Our expertise also extends to underground power infrastructure, where we are delivering high-voltage transmission systems that integrate critical utility networks while minimising surface disruption. Together, these capabilities demonstrate our ability to bring structural, subterranean, marine and energy expertise under one platform, enabling us to deliver interconnected infrastructure that supports Taiwan’s long-term economic and energy needs.

Backed by a strong local track record and a dedicated team, Gamuda Taiwan is well positioned to support the region’s continued growth. We continue to pursue strategic opportunities with local and international partners, bringing innovative engineering solutions and integrated capabilities to infrastructure projects across multiple sectors.

Keelung Mass Rapid Transit Systems and Trackwork Project
Kaohsiung Metropolitan Mass Rapid Transit (MRT) Xiaogang–Linyuan Line Civil Works and Electromechanical Facilities Project
345kV Gangfeng-Zhongke, Zhongke Hengshan Underground Transmission Line (Third Section)
Xizhi Donghu Mass Rapid Transit
Kaohsiung Mass Rapid Transit Metropolitan Yellow Line Package YC01
Kaohsiung Port Intercontinental LNG Terminal - Wharf and Connecting Roads (Bridges)
TaoYuan City Underground Railway Project, Package CJ18 PingZhen Commuter Station
Marine Bridge – Guantang
Seawall - Taipei Port
161kV Songshu to Guangfeng Underground Transmission Line
Kaohsiung Mass Rapid Transit Metropolitan Orange Line Package C04