NEDA39 Solar Farm
Building Malaysia’s Energy Grid
Marking a pivotal milestone in our journey towards a sustainable future, we have boldly ventured into the electricity market with the inauguration of our very first Solar Power Plant in Neda Pekan.
Developing a sprawling 125-acre, 39 MWp solar farm is a significant engineering and logistical feat. To maximise efficiency and future-proof this vital facility, we are moving beyond traditional static solar arrays. By integrating cutting-edge technology, including advanced solar trackers that follow the sun's trajectory and a robust battery energy storage system (BESS), we are ensuring optimal energy capture and long-term grid reliability.
Powering a Greener Tomorrow
This facility is meticulously designed to deliver high-yield, sustainable energy while strictly adhering to national green initiatives:
Strategic Framework Alignment: Operating seamlessly under Tenaga Nasional Berhad’s (TNB) New Enhanced Dispatch Arrangement (NEDA) framework, which firmly underpins the Malaysian government’s Corporate Green Power Programme (CGPP).
High-Yield Generation: Estimated to generate an impressive 64,000 MWh of clean solar power, alongside valuable Renewable Energy Certificates (RECs), annually upon full operation.
This project goes beyond a standalone solar farm; it serves as the launchpad for our larger vision. With this inaugural development, we are fast-tracking our plans to expand our renewable energy portfolio to more than 800 MW in the years ahead, firmly positioning ourselves as a leading private renewable energy producer in Malaysia.
Developing a sprawling 125-acre, 39 MWp solar farm is a significant engineering and logistical feat. To maximise efficiency and future-proof this vital facility, we are moving beyond traditional static solar arrays. By integrating cutting-edge technology, including advanced solar trackers that follow the sun's trajectory and a robust battery energy storage system (BESS), we are ensuring optimal energy capture and long-term grid reliability.
Powering a Greener Tomorrow
This facility is meticulously designed to deliver high-yield, sustainable energy while strictly adhering to national green initiatives:
Strategic Framework Alignment: Operating seamlessly under Tenaga Nasional Berhad’s (TNB) New Enhanced Dispatch Arrangement (NEDA) framework, which firmly underpins the Malaysian government’s Corporate Green Power Programme (CGPP).
High-Yield Generation: Estimated to generate an impressive 64,000 MWh of clean solar power, alongside valuable Renewable Energy Certificates (RECs), annually upon full operation.
This project goes beyond a standalone solar farm; it serves as the launchpad for our larger vision. With this inaugural development, we are fast-tracking our plans to expand our renewable energy portfolio to more than 800 MW in the years ahead, firmly positioning ourselves as a leading private renewable energy producer in Malaysia.
Project Snapshot
Project Snapshot
1 / 15
Project Details
Location
Pahang, Malaysia
Year
2022 - 2023
Project Sum
RM 120.9 million