Kaohsiung Metropolitan Mass Rapid Transit (MRT) Xiaogang–Linyuan Line Civil Works and Electromechanical Facilities Project
Kaohsiung Metropolitan Mass Rapid Transit (MRT)
Xiaogang–Linyuan Line Civil Works and Electromechanical Facilities Project
Backed by deep engineering expertise, we deliver critical infrastructure, from metros, roads and bridges to advanced water treatment, connecting communities and supporting a more resilient future.
Strong Regional Growth: Gamuda Lands Tenth Taiwanese Infrastructure Win
Marking our tenth infrastructure project win in Taiwan, we secured the Kaohsiung Metropolitan Mass Rapid Transit (MRT) Xiaogang–Linyuan Line Civil Works and Electromechanical Facilities Project.
The project was awarded to an unincorporated joint venture between Gamuda (70% stake) and Taiwanese-based Shang Ting (30% stake) by the Government Mass Rapid Transit Bureau, a MRT division established under the Taiwan Kaohsiung City Government. With a majority stake, our share of the contract value is RM2.31 billion (NTD 18.47 billion).
With a duration of seven years and four months, our joint venture's scope of works as the main contractor includes:
The project was awarded to an unincorporated joint venture between Gamuda (70% stake) and Taiwanese-based Shang Ting (30% stake) by the Government Mass Rapid Transit Bureau, a MRT division established under the Taiwan Kaohsiung City Government. With a majority stake, our share of the contract value is RM2.31 billion (NTD 18.47 billion).
With a duration of seven years and four months, our joint venture's scope of works as the main contractor includes:
- Three underground stations (RL4, RL5, RL6);
- One elevated station (RL7);
- 3.88 km of underground twin-bound railway track; and
- Six units of cross passages.
Project Details
Location
Kaohsiung, Taiwan
Year
2026
Project Sum
RM3.30 billion (NTD 26.39 billion)