Kaohsiung Metropolitan Mass Rapid Transit (MRT) Xiaogang–Linyuan Line Civil Works and Electromechanical Facilities Project

/
/
Kaohsiung Metropolitan Mass Rapid Transit (MRT) Xiaogang–Linyuan Line Civil Works and Electromechanical Facilities Project

Kaohsiung Metropolitan Mass Rapid Transit (MRT)

Xiaogang–Linyuan Line Civil Works and Electromechanical Facilities Project

Backed by deep engineering expertise, we deliver critical infrastructure, from metros, roads and bridges to advanced water treatment, connecting communities and supporting a more resilient future. 

Strong Regional Growth: Gamuda Lands Tenth Taiwanese Infrastructure Win

Marking our tenth infrastructure project win in Taiwan, we secured the Kaohsiung Metropolitan Mass Rapid Transit (MRT) Xiaogang–Linyuan Line Civil Works and Electromechanical Facilities Project.

The project was awarded to an unincorporated joint venture between Gamuda (70% stake) and Taiwanese-based Shang Ting (30% stake) by the Government Mass Rapid Transit Bureau, a MRT division established under the Taiwan Kaohsiung City Government. With a majority stake, our share of the contract value is RM2.31 billion (NTD 18.47 billion).

With a duration of seven years and four months, our joint venture's scope of works as the main contractor includes:

  • Three underground stations (RL4, RL5, RL6);
  • One elevated station (RL7);
  • 3.88 km of underground twin-bound railway track; and
  • Six units of cross passages.
Since entering the Taiwanese market in 2002, we have evolved into a trusted partner for the nation’s infrastructure development. This tenth win reinforces our expertise in managing complex, multi-disciplinary infrastructure, ranging from railway systems to large-scale marine works.

Project Details

Location
Kaohsiung, Taiwan
Year
2026

Project Sum

RM3.30 billion (NTD 26.39 billion)