/
/
Rasa and Bukit Badong Water Treatment Plants
Rasa and Bukit Badong Water Treatment Plants
Xiaogang–Linyuan Line Civil Works and Electromechanical Facilities Project
Backed by deep engineering expertise, we deliver critical infrastructure, from metros, roads and bridges to advanced water treatment, connecting communities and supporting a more resilient future.
The SSP3 Treatment Network: Powering Urban Supply
Providing clean and safe water for Malaysia’s biggest cities is a critical mission. As the treatment heart of the SSP3 scheme, the plants at Rasa and Bukit Badong were engineered to be reliable and efficient. These facilities ensure that the daily water needs of surrounding residents are met with consistent quality and precision.
- A combined capacity of 1,050 MLD across two strategic sites.
- Advanced technology featuring clarifiers and pH correction for reliable supply.
- Integrated water quality monitors and disinfection systems to ensure safety.
Project Details
Location
Selangor, Malaysia
Year
2000 – 2005
Project Sum
RM2.2 billion
